Change Control: The Good, The Bad and The Things You Need to know for an Effective Program

Duration 90 Mins
Level Basic
Webinar ID IQW15C8810

  • Review the current regulatory requirements for change control
  • Discuss when change control needs to be implemented and the main items it should cover
  • What are the major sections that need to be included in a change control procedure
  • What are the typical industry challenges associated with change control procedures
  • Review the benefits that a well-controlled change control process can provide
  • What are the most common deficiencies cited by regulatory auditors when auditing change control programs
 

Overview of the webinar

This webinar will help provide a template against which attendees can compare their own change control program, get insight into items to add to their procedures based on deficiencies cited by regulators or items to include when trying to start a change control program for the first time.

Who should attend?

  • Quality Assurance
  • Quality Control
  • Manufacturing
  • Production
  • Regulatory
  • Laboratory Personnel
  • Management
  • Equipment Vendors

Why should you attend?

An effective quality system program, along with several regulatory requirements, includes the documentation and evaluation of changes made to validated equipment, utilities, processes and controlled documents. To control this process, one must have both a defined change control procedure that outlines responsibilities and documentation requirements and also a form by which required information is recorded. The effectiveness of these items will determine the success of your change control program.
This webinar will concentrate on three major points:
  • The regulatory requirements for change control and what it applies to
  • How to develop a change control SOP that will define what is required, responsibilities, and a means to quickly provide summaries of changes to investigators
  • What are some of the common deficiencies cited by regulatory auditors
In addition, the webinar will also highlight some of the benefits that a well-maintained change control program provides to a company along with reviewing when change control is not required. Attendees will be able to ask questions on issues relating to their own change control procedure.
 

 

Faculty - Mr.Kenneth Christie

Kenneth Christie has over 30 years of sterile manufacturing and regulatory GMP consulting experience in the areas of quality assurance and validation management in the pharmaceutical and biotechnology industries. Mr. Christie is currently the Chief Operating Officer for VTS Consultants, Inc., located in Amherst, MA. His responsibilities specifically include quality system auditing, GMP training and serving as a subject matter expert for aseptic manufacturing processes, medical devices, APIs and solid dosage processing equipment, utilities and systems on a global basis. He also performs vendor audits, site pre-approval inspections and assists clients with addressing and correcting regulatory observations.
Mr. Christie was the validation manager at Parke-Davis' Sterile Products Facility where he was involved in the review and approval of all facilities, equipment, and system commissioning/qualification activities. He had routine interaction with the FDA and European inspectors (EMEA), corporate management and third party contract manufacturing representatives to defend validation practices and to assure regulatory compliance for the manufacture of aseptically produced products. Mr. Christie is a speaker and trainer for several professional organizations in the US, Canada, Europe and Asia and is a published author of several articles dealing with the challenges of aseptic processing. Additionally, he serves as a member of the ISPE’s Professional Certification (PCC) Commission as an Examination Development Committee (EDC) member.
Mr. Christie has a BS degree in biology from Shippensburg State University (PA) and an executive MBA degree from Michigan State.

100% MONEY BACK GUARANTEED

Refund / Cancellation policy
For group or any booking support, contact: